Coal Quay Upgrade Works Dublin Port
The berths had fallen into a state of disrepair over many years of heavy industrial use. The project called for the removal of the existing road pavement, historical crane rails and existing dilapidated infrastructure. The pavement surface was then replaced with a high strength concrete pavement, making use of silica fume, together with replacement of sub surface specialist import pipe infrastructure, drainage and power supply ducting. The works also required installation of new bollards, ladders, quay edge restraints and lighting upgrades to assist with future operation of the berths.
DBFL provided the full design service with pavement design, support structures for the new metal recycling area, drainage design and coordination of specialist services.