Cork St. Student Accommodation
A central courtyard is provided at ground floor and also a courtyard at roof terrace level serving the development and to achieve the green roof requirements. No car parking spaces are provided on the site, but two disabled on-street parking spaces are provided with a set down space for delivery vehicles.
The structure of the building is in-situ reinforced concrete frame with reinforced concrete flat slabs at each floor. The flat slab arrangement enables services to traverse the ceiling void without interruption from downstand beams. External walls are constructed with an outer facing brick and an inner SFS stud system.
The development is currently in detailed design stage with demolition of factory facility due to commence in early 2018.