Dunshaughlin Community College
The 2-storey extension comprises traditional masonry construction with precast concrete floors at first floor level and structural steelwork where necessary to deal complexities in supporting the first floor walls and roof. The first floor overhangs the ground floor walls beneath requiring a colonnade of structural steel columns encased in concrete with steel beams supports the external walls and the first floor overhang. The roof will consist of insulated roof panels supported on steel purlins and masonry walls.
The project included the provision of a new entrance road network with a one-way loop arrangement and setdown/parking bays to the front of the school and a full size GAA and Soccer pitch to the rear of the site.