• About Us
    • About DBFL
    • Our Team
    • DBFL Values
  • Projects
    • Awards
    • See All Projects
  • What We Do
  • News & Insights
  • Careers
    • Come Work With Us
    • Graduate Development Programme
    • Early Career Programme
  • Sustainability
    • Environmental, Social and Governance Report
  • Equity, Diversity and Inclusion
  • Contact DBFL
DBFL - Logo
Menu

LDR6, Meath

Close
  1. Home
  2. LDR6, Meath
DBFL's Role Civil, Structural & Transport Engineers
Value €5M
Location Meath
Status Complete

Client: Meath County Council

DBFL were appointed by Meath County Council on this €5m LIHAF project which included the construction of approximately 1.2km of single lane carriageway road & associated services on a greenfield site.

Project Overview

The works include junction upgrades and tie in works to the existing R153 and Old Road; 3 new roundabouts; a new culvert crossing the Mill Race Stream; footpaths and cycleways.
A new 650m strategic gravity sewer of 750mm diameter to depths up to 6.5m is included in the works..

The Challenges

The works include junction upgrades and tie in works to the existing R153 and Old Road; 3 new roundabouts; a new culvert crossing the Mill Race Stream; footpaths and cycleways.
A new 650m strategic gravity sewer of 750mm diameter to depths up to 6.5m is included in the works.
Additional Irish Water works included 1716m of rising foul mains of diameters varying between 100mm and 250mm associated infrastructure & 850m of strategic ductile iron water main of 500mm diameter with associated infrastructure; SUDS management included a surface water attenuation pond, 300m of stone infiltration trenches and one 20m diameter stonefill soakaway to depths of up to 4.5m.

The Outcome

Utilities requirements included 1.5km trenching, ducting and backfilling works to accommodate the undergrounding of a 38kV ESB supply line. The works extends beyond the extent of the roadway; works to facilitate the temporary alteration of the 38kV line to facilitate construction works where deemed necessary by the ESB. 1.1km of gas distribution main and spur connections, 1.1km of PE water main of 180mm dia. with spur connections; local communication and electrical supply trenches, ducting, access chambers.

Bill Bates Director Civils Engineer at DBFL

Project Director

Bill Bates

Contact
Central Plaza
Previous Project
Central Plaza Case Study
Next Project
Oscar Traynor Road
All Projects
  • What We Do
  • Projects
    • Awards
    • Case Studies
  • Careers
  • News & Insights
  • Sustainability
  • Equity, Diversity and Inclusion
  • About Us
    • Our Team
    • DBFL Values
  • Contact DBFL

Dublin Office

+353 1 400 4000

Ormond House
Upper Ormond Quay
Dublin 7
D07 W704

Get Directions

Cork Office

+353 21 202 4538


14 South Mall
Cork
T12 CT91

Get Directions

Galway Office

+353 91 33 55 99

Odeon House
7 Eyre Square
Galway
H91 YNC8

Get Directions

Waterford Office

+353 51 30 95 00

Suite 8b The Atrium
Maritana Gate, Canada St
Waterford
X91 W028

Get Directions

©Copyright 2025 DBFL. All rights reserved. | Privacy | Terms + Conditions | Cookie Preferences