• About Us
    • About DBFL
    • Our Team
    • DBFL Values
  • Projects
    • Awards
    • See All Projects
  • What We Do
  • News & Insights
  • Careers
    • Come Work With Us
    • Graduate Development Programme
    • Early Career Programme
  • Sustainability
    • Environmental, Social and Governance Report
  • Equity, Diversity and Inclusion
  • Contact DBFL
DBFL - Logo
Menu

SAS Radisson Farnham Estate

Close
  1. Home
  2. SAS Radisson Farnham Hotel
DBFL's Role Civil and Structural Engineers
Value €50M
Location Cavan
Status Completed

Client: Roy McCabe

 

Project Overview

This development involved the retention of the existing Farnham House in Cavan (c. 1780) and the construction of a 150-bedroom hotel, conference centre and state-of-the-art spa complex. The development is located on the 2,500-acre Farnham Estate formerly owned by Lord Farnham which also included an 18-hole golf course and residential accommodation.

The Challenges

The new development was constructed, maintaining as much of the character of the original estate as possible. Many of the existing structures including the main house were listed and the retention of these in the overall development required careful consideration. The upgrading of the existing house from domestic to commercial use required strengthening of floors, roof and walls whilst ensuring that structure introduced was not visible.

Furthermore, the design required the existing walled garden to be incorporated into a new conference facility and this involved providing a retention system within the existing wall which was tied back to the new structure.  An understanding of how an existing structure will respond to adjacent extension works is vital and a knowledge of the techniques available to introduce discrete and sensitive strengthening solutions are important. This was further used when converting the stone-built stables and outhouses into Spa treatments rooms and library accommodation where existing stone walls were stabilized and tied into the new structure.

The Spa facility provided its own challenges with the level of plant servicing the swimming pool and treatment rooms. This required close coordination with the M&E consultants, the Spa designer and the lead architect. The swimming pool was both internal and external and had a blade edge to the pool with a hidden external channel. This was called the Infinity Pool and similarly required close coordination with the other members of the design team and also the contractor on site.

 

 

The Outcome

The final development consists of an overall hotel complex with 150 bedrooms, bars, restaurants, conference / function facilities, leisure centre etc. The hotel complex is located around the exiting Farnham House at the southern end of the estate. The 4,000 sqm Health Spa, building designed by specialist Heinz Schletterer, contains a hydrotherapy pool as well as some 30 treatment rooms and associated facilities.

 

The development works also included the construction of an 18-hole golf course on the estate with the necessary drainage / surface water management provisions. This involved the construction of a road network and servicing of the lands, with strengthening to old stone bridges and part of the works.

John Hayes is a Director of Structures and Chairman at DBFL Consulting Engineers

Project Director

John Hayes

Contact
Plaza Hotel Ballymun
Previous Project
Plaza Hotel Ballymun 
Next Project
Dylan Hotel  
All Projects
  • What We Do
  • Projects
    • Awards
    • Case Studies
  • Careers
  • News & Insights
  • Sustainability
  • Equity, Diversity and Inclusion
  • About Us
    • Our Team
    • DBFL Values
  • Contact DBFL

Dublin Office

+353 1 400 4000

Ormond House
Upper Ormond Quay
Dublin 7
D07 W704

Get Directions

Cork Office

+353 21 202 4538


14 South Mall
Cork
T12 CT91

Get Directions

Galway Office

+353 91 33 55 99

Odeon House
7 Eyre Square
Galway
H91 YNC8

Get Directions

Waterford Office

+353 51 30 95 00

Suite 8b The Atrium
Maritana Gate, Canada St
Waterford
X91 W028

Get Directions

©Copyright 2025 DBFL. All rights reserved. | Privacy | Terms + Conditions | Cookie Preferences