Tallaght Stadium

Close
  1. Home
  2. Tallaght Stadium 
DBFL's Role Civil and Structural Engineers
Value €11M
Location Tallaght, Dublin
Status Completed

Client: South Dublin County Council

DBFL provided civil & structural engineering, plus PSDP services on this project which comprised of a new North Stand, refurbishment works to the existing West stand including media and hospitality facilities, and works to the disabled seating areas in the South Stand at Tallaght Stadium.

Project Overview

The new North Stand provides increased capacity for the stadium, bringing the total capacity of the stadium to over 10,000, and also accommodates ground floor level commercial spaces and concessions, in addition to ancillary service spaces. Given its prominent position on the stadium site, with frontage onto the N81, the new North Stand is the defining aesthetic of the stadium, and this is reflected in the striking architectural design for the precast concrete stand with the inclusion of feature steel wing walls which fold at an angle from roof to ground level at either end of the stand.

In addition to the works for the new stand, extensive upgrading works have also been undertaken in the existing west stand providing additional hospitality and media facilities. The media seating area in the West Stand has been upgraded and extended, with expanded back of house media support areas provided. Hospitality facilities in the West Stand have also been upgraded and extended. Additionally works are also being undertaken in the South Stand to incorporate additional disabled viewing/seating areas.

These works coupled with the new North Stand, bring the stadium up to a UEFA category 4 stadium. This will enable the stadium to host all European games including group games for the Champions League, Europa League or Europa Conference League.

The Challenges

The key challenge of this project was working in a live stadium environment and ensuring stadium operations were maintaining undisrupted for the duration of the works. Construction traffic off the busy N81 had to be managed carefully and the off site construction of the superstructure reduced time on site.

The Outcome

The design approach maximised structural utilisation, with the precast nature of the superstructure minimising material waste and off site construction reducing time on site.

Tracy Kearney Director Structures Engineer at DBFL

Project Director

Tracy Kearney

Contact
Beckette Locke Hotel
Previous Project
Beckett Locke Hotel 
HSE Community Nursing Units PPP
Next Project
HSE Community Nursing Units PPP
All Projects
  • What We Do
  • Projects
    • Awards
    • Case Studies
  • Careers
  • News & Insights
  • Sustainability
  • Equity, Diversity and Inclusion
  • About Us
    • Our Team
    • DBFL Values
  • Contact DBFL

Dublin Office

+353 1 400 4000

Ormond House
Upper Ormond Quay
Dublin 7
D07 W704

Get Directions

Cork Office

+353 21 202 4538


14 South Mall
Cork
T12 CT91

Get Directions

Galway Office

+353 91 33 55 99

Odeon House
7 Eyre Square
Galway
H91 YNC8

Get Directions

Waterford Office

+353 51 30 95 00

Suite 8b The Atrium
Maritana Gate, Canada St
Waterford
X91 W028

Get Directions

©Copyright 2025 DBFL. All rights reserved. | Privacy | Terms + Conditions | Cookie Preferences