Rapid Progress at Blackrock Villas, Cork

18 June 2025

Works are progressing rapidly at Glenveagh Properties plc’s Blackrock Villas development. This new residential development will deliver 298 apartments in the heart of Blackrock, Cork.

The development consists of three separate residential blocks ranging from 5-7 storeys over insitu concrete podium transfer slabs and common undercroft partial basements.

The superstructure blocks are constructed from precast concrete walls and precast hollowcore / lattice slab floors. These bear on insitu concrete transfer slabs located at podium level over the insitu concrete undercroft partial basements. The entire development is supported on CFA piles in conjunction with insitu concrete pile caps and piled ground beams.

DBFL are proud to be providing full Civil and Structural Engineering services to this fantastic development. Please keep an eye on the skyline and our progress over the coming months.

Client/Main Contractor: Glenveagh Properties plc
Architect: O’Mahony Pike Architects
Mechanical & Electrical: EDC
Assigned Certifier: ORS
Landscape Architect: Ilsa Rutgers
Precast Superstructure: Kilsaran Precast Ltd
Drone images by EDC – Engineering Design Consultants

Rapid Progress at Blackrock Villas, Cork

 

 

See All News